Table of contents 7 section
On a general average, the installation time of a cold storage can vary between 2 days and 30 days. However, this period is not clear; because each project has its own needs.
Key factors affecting installation time:
● Storage volume and number of panels to be used.
● Cooling system type (Split, Central, Natural Fluid CO2 etc.).
● Additional equipment (Shelf systems, humidification units, fast PVC doors).
● Infrastructure and electrical preparation.
● Function of the project (Freezing facilities, logistics warehouses or fruit ripening rooms).
Main Elements Affecting Duration 🛠️
1. Project Type and Engineering Details
The purpose of use of the warehouses directly affects the duration. For example;
● Questing – Fast Freezing Systems:Since it contains high-capacity devices, the installation time is longer than standard warehouses.
● Fruit Ripening and Controlled Atmosphere: The engineering phase is more detailed due to sensitive gas control systems and leakage tests.
2. Cooling System Selection
Frigocare CoolingThe systems we use have different installation times:
● Split Cooling: Provides faster installation.
● Central and Natural Fluid Systems:It requires more time as it requires comprehensive piping and engine room planning.
3. Cold Room Panels and Doors
Panel thickness and number determine the assembly speed. Automation connections of sliding or high-speed PVC doors are also included in the process.
Frigocare Cooling Installation Steps ✅
We follow these 10 steps to speed up the process and ensure error-free delivery:
1. Discovery and Needs Analysis:Determination of product type and temperature range.
2. Project Design:Preparation of engineering drawings.
3. Heat Loss Calculations: Device selection for energy efficiency.
4. Production and Supply:Preparation of panels and devices.
5. Panel Mounting: Establishing wall, ceiling and floor insulation.
6. Door Installation: Performing tightness tests.
7. Device Installation: Piping and gas charging.
8. Automation Connections: Activation of sensors and control panel.
9. Testing Process: Commissioning and performance analysis.
10. Delivery and Training:Providing technical training to the user.
Which Warehouses Are Established in a Shorter Time?
● 🚀 Quick Installation (2-7 Days): Small-scale dairy warehouses, standard logistics warehouses and potato-onion ventilation systems.
● 🏗️ Comprehensive Installation (15-30 Days): Large tonnage logistics centers, meat processing plants, freezing rooms and controlled atmosphere warehouses.
Why Frigocare Cooling?
Thanks to the correct engineering plan and our experienced installation team, we ensure that your business becomes operational without wasting time. We guarantee fast and trouble-free installation in advanced technologies such as central cooling, CO2 natural fluid systems and ultrasonic humidification.
Our Contact Information: 🏢 Company: Frigocare Refrigeration Turkey 📱 Phone: +90 545 517 79 75
Frigocare Cooling – Professional Engineering, Fast Delivery! 🚀🚀
Get technical consultancy for your project
Let's evaluate your cooling needs together; Let us offer you a special solution and offer.
- Discovery & feasibility
- Turnkey project
- 24/7 technical support